"Defining the Path, creating the Hope and delivering the Dream."

Soaring to Success: Building an MVP with VIBEcoder

GS
Greg Spehar
May 20, 2025 • 8 min read
Female cheetah with blue wings and glasses in front of 'We Can Do It' poster - Building an MVP with VIBEcoder

Building a Minimum Viable Product (MVP) is like giving your startup wings—it's your first flight to test an idea before committing to a full journey. But the skies are full of risks: unclear goals, tangled code, or a product that misses the mark. That's where VIBEcoder comes in—a toolkit that harnesses AI to streamline MVP creation, cutting traditional 3-4 month timelines to under a month. In this updated guide, we'll walk you through the clarified process, spotlighting how each step leverages VIBEcoder's features (like AI Project Planning and ERMS) to reduce risks and propel you toward success. Ready to take flight? Let's go!

Why VIBEcoder? A Smarter Path to Liftoff

VIBEcoder isn't just about speed—it's about precision. By blending AI-driven tools with a structured process, it tackles common pitfalls like miscommunication, technical debt, and security gaps. Think of it as your co-pilot, guiding you from vision to victory. Here's how the updated process unfolds.

Step-by-Step Process to Build Your MVP

Step 1: Develop Requirements and Plan with AI Project Planning

What Happens:

The journey begins with defining your business requirements—your destination on this flight. Using the AI Project Planning component (one of VIBEcoder's five powerful features), you break these requirements into clear, actionable steps. This tool doesn't just organize—it ensures every task is precise and adaptable to changes.

Why It's Critical:

  • A shaky start can ground your project. The breakdown of requirements into actionable steps sets a solid foundation.
  • AI Project Planning aligns your team, turning vague ideas into a flight plan everyone can follow.

How It Reduces Risk:

  • Clarity: Eliminates the 70% of IT failures tied to unclear goals.
  • Flexibility: Adapts to evolving needs, curbing scope creep.
  • Alignment: Keeps stakeholders and developers in sync.

Pro Tip: Frame requirements as user stories (e.g., "As a user, I want [feature] so that [benefit]") for maximum clarity.

Step 2: Build Features with the Circular Daily Routine

What Happens:

With your plan set, you enter the Circular Daily Routine—a daily loop that drives feature development with efficiency and control. Here's how it works:

  1. Check In on the Code: Start by reviewing the current codebase—like a pre-flight inspection.
  2. Work Through the Action List: Use the Rules engine to guide the AI in generating code, following the tasks laid out by AI Project Planning.
  3. Add Test Cases: Along the way, insert tests to verify functionality.
  4. Perform Security Checks: Apply security Rules to lock down vulnerabilities.
  5. Check In the Code: Once actions for a feature are complete, log your changes.
  6. Run Cleanup Tools: Confirm changes are solid, update AI-referenced elements, and keep the codebase lean.
  7. Manage the HitList: Note items not updated now but useful later, integrating them into AI Project Planning for future sprints.

This loop repeats for each feature. Multiple team members can work simultaneously, and the routine spans day to day as needed.

Why It's Critical:

  • This iterative cycle ensures steady progress, with quality and security baked in.
  • The HitList keeps future ideas organized without derailing the current scope.

How It Reduces Risk:

  • Daily Check-Ins: Keep the team aligned and progress visible.
  • Rules Engine: Ensures consistent, AI-guided coding.
  • Test Cases: Catch bugs early.
  • Security Checks: Prevent breaches before they start.
  • Cleanup: Cuts technical debt.
  • HitList: Avoids clutter by parking ideas for later.

Pro Tip: Treat this routine like a pilot's checklist—methodical, repeatable, and essential for a smooth flight.

Step 3: Coordinate the Team with ERMS

What Happens:

As features take shape, managing the Rules Directory becomes vital—especially with multiple developers in the air. The Enterprise Rules Management System (ERMS) steps in, acting as air traffic control to enforce consistency across the team.

Why It's Critical:

  • A unified Rules Directory ensures every developer follows the same standards, from coding rules to security protocols.

How It Reduces Risk:

  • Consistency: Prevents errors from mismatched practices.
  • Team Sync: Keeps everyone on the same flight path.
  • Scalability: Supports growth without chaos.

Pro Tip: Regularly review the Rules Directory in ERMS to keep it current as your project evolves.

Step 4: Final Testing and Quality Assurance

What Happens:

Once all features are developed, perform comprehensive testing—think integration checks and user acceptance—to ensure your MVP is flight-ready.

Why It's Critical:

  • This step confirms that individual features work together as a cohesive product.

How It Reduces Risk:

  • Integration: Spots issues missed in daily tests.
  • Validation: Ensures the MVP meets user needs.

Pro Tip: Simulate real-world scenarios to stress-test your MVP before takeoff.

Step 5: Launch and Collect Feedback

What Happens:

Release your MVP into the wild and gather feedback via surveys, social media, or direct outreach. Use this intel to refine your product.

Why It's Critical:

  • Feedback is your compass for future iterations.

How It Reduces Risk:

  • Market Fit: Confirms demand before over-investing.
  • Improvement: Drives data-backed enhancements.

Pro Tip: Ask users, "What's one thing we could do better?" for focused insights.

Success Story: TechLaunch's 21-Day MVP

TechLaunch, a fintech startup, used VIBEcoder to build their payment processing MVP in just 21 days—78% faster than their previous development cycle. The key? AI Project Planning clarified their roadmap, while the Circular Daily Routine kept their small team synchronized and moving quickly through features.

"VIBEcoder didn't just speed us up—it made us more precise. The Rules engine caught issues we would have missed, and ERMS kept everyone on the same page. We launched with confidence and secured our next funding round based on the strength of the MVP." —Sarah Chen, CTO at TechLaunch

Conclusion: Take Flight with Confidence

Building an MVP with VIBEcoder is like piloting a plane with the best navigation tech onboard. From crafting requirements with AI Project Planning, to iterating through the Circular Daily Routine, to keeping the team in sync with ERMS, every step is designed to lift you above risks and land you in success. The result? An MVP that's not just viable but unstoppable—all in a fraction of the usual time.

Ready to soar with your MVP?

Learn how VIBEcoder can help you build, launch, and iterate faster than ever. Check out myvibecoder.us to get started.

Questions? Reach out at greg@gidanc.ai or follow us on LinkedIn and X.

Frequently Asked Questions

How does VIBEcoder reduce MVP development time?

VIBEcoder leverages AI-powered tools like AI Project Planning and the Rules engine to streamline requirements, automate code generation, and implement a structured daily routine that reduces development time from the traditional 3-4 months to under a month.

What is the Circular Daily Routine in VIBEcoder?

The Circular Daily Routine is VIBEcoder's core development process that includes checking the code, working through an action list, adding test cases, performing security checks, checking in code, running cleanup tools, and managing the HitList—all in a repeatable cycle that ensures consistent progress.

How does ERMS help in MVP development?

The Enterprise Rules Management System (ERMS) acts as 'air traffic control' for development teams, ensuring all developers follow the same standards, from coding practices to security protocols, which maintains consistency and reduces errors across the project.

Can VIBEcoder help reduce risks in MVP development?

Yes, VIBEcoder specifically addresses common MVP risks through clear requirements with AI Project Planning, consistent code quality with the Rules engine, automated testing, built-in security checks, and technical debt management—all helping to deliver a more stable MVP in less time.

GS

Greg Spehar

Founder of VIBEcoder and pioneer in AI-assisted development methodologies. With over 30 years of software development experience, Greg has been at the forefront of integrating AI into the development workflow.

Ready to try VIBEcoder?

Experience the productivity revolution firsthand with VIBEcoder's AI-driven development tools.

Get Started

Learn More

Explore our documentation and resources to dive deeper into VIBE Coding concepts.

Browse Features